Sobha One Residences Phase 2 Project Details: The 2026 Update


Featured Image of Phase 2 Project Details The 2026 Update

The Sobha One Residences Phase 2 project details are finally out for this big new launch in Hoskote. This part of the project is officially named "One Residences at Sobha One World Phase 2" and covers Wings 3 and 4. It’s a massive apartment complex coming up in the Bengaluru Rural area. If you are looking at the dates, the work officially starts on August 18, 2026. The builders plan to have everything finished and ready by November 30, 2032.

This is not a small project. It is made of 530 flats in total. The whole site sits on about 23,704 square meters of land in a place called Amanidoddakere Village. One thing people will like is that the project has a lot of open space—over 17,584 square meters. The plans are already approved by the STRR Planning Authority. This means all the legal checks are done, and the project is ready to move forward this year.

Where Exactly Is the Project?


The project is located in the Hoskote Taluk, which is a growing part of Bengaluru Rural. The exact address is Sy.No. 27, 31/1, 31/2, 33/1, and a few other plots in Amanidoddakere Village. It’s right in the Kasaba Hobli area, with a pin code of 562114.

The site is easy to enter because the enclave is near the main road that reaches from Bangalore to Kolar. On the West side, there are existing roads and other village properties. To keep things running, the building will get its water from borewells and the local Gram Panchayat. The official plan was approved on May 7, 2026, so the paperwork is fresh and up to date.

Flat Inventory and Parking Space


A big part of the Sobha One Residences Phase 2 project details is about the living space and where you park your car. There are 530 apartments being built here. To make sure nobody has to park on the street, they are building exactly 530 covered parking spots. This means every single flat gets one safe, roofed spot for a vehicle.

There are no open parking spots or garages in this specific phase. Everything is tucked under the building. The project is designed to be a "Group Housing" complex, so there is plenty of room for families. The total built-up area for all the floors adds up to 92,527 square meters. Even though there are many flats, the huge open area means it won't feel too crowded when you walk around outside.

Area and Cost Numbers at a Glance


The budget for this project is very high because it is a premium build. The total cost is over 536 Crore INR. This covers the land cost and all the work to build the towers.

Phase 2 Conversions

  • Total Land Area: 255,147.49 Sq Ft (5.857 Acres)
  • Total Open Area: 189,272.42 Sq Ft (4.345 Acres)
  • Total Carpet Area: 407,069.17 Sq Ft (9.345 Acres)
  • Number of Flats: 530 Units
  • Covered Parking Spots: 530 Spaces
  • Total Project Cost: 536.3 Crore INR

The land itself is worth about 54 Crore INR. The rest of the money, which is about 481 Crore INR, is for the construction and the development of the whole layout.

Why Choose This Hoskote Location?


Hoskote is becoming a top spot for new homes because of the Satellite Town Ring Road (STRR). It’s perfect for people who want to be close to the city but don't want to live in the middle of all the noise and pollution.

These Sobha One Residences Phase 2 project details show that the project is well-planned and has all its legal approvals in place. Since the start date is in 2026 and it finishes in 2032, it’s a good long-term plan for families. You are getting in at the start of a new project in a quiet, growing part of the Bengaluru Rural district. It’s a solid choice for anyone working in the East Bangalore IT hubs or nearby industrial areas.

Frequently Asked Questions (FAQs)


1. When does Sobha One Phase 2 construction start?

The official project start date is August 18, 2026.

2. How many apartments are in this phase?

As per RERA are a total of 530 flats being built in Wings 3 and 4.

3. What is the final completion date?

The developer is telling the project will be finished by November 30, 2032.

4. Where is the project located?

The project in Amanidoddakere Village, Hoskote, near the Bangalore-Kolar highway.

5. Is there enough parking for all the residents?

Yes. There is 530 covered parking spots, which is exactly one for every flat.

6. Who approved the building plans?

The plans were approved by the Satellite Town Ring Road Planning Authority (STRRPA) in May 2026.

Enquiry
Enquire Now